Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

New instruments were installed during the ACO-6 cruise on 6/20/2018 (hydrophone, secondary node). BSP1 and BSP2 disconnected from ACO until further notice. Data affected: CTD2, CTD3, Pressure and Fluorometer.

ACO Construction Videos

Slide 1

ALOHA Cabled Observatory-The Movie

Slide 2

JASON doing post-deployment clean-up.

Slide 6

Junction Box being prepared for deployment.

Slide 5

Free-fall deployment of the camera.

Example Frame