Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

The BSP2 dislodged from the bottom on 4/11/18, 00:53 UTC, moved to 25-30 mab and is floating with the current. CTD3, BPR pressure and fluorometer data may be affected.

New ACO instruments were installed during the ACO-3 cruise on 2014/11/01. Click here for ACO-3 videos.

ALOHA Cabled Observatory
Hydrophone Experiment Module Engineering Data
Temperature
Temperature 1 :
Temperature 2 :
Temperature 3 :
Temperature 4 :
12.736179
12.957322
15.371543
8.719429
°C
°C
°C
°C
Date: May 20, 2018    19:15:23 UTC
Pressure, Current, Voltage
Pressure:
Center +48 V dc:
+48 V dc :
Ground Fault Offset:
Voltage Reference:
3.277833
24.024
48.144
-0.096
2.487
PSI
V
V
V
V
Date: May 20, 2018    19:15:23 UTC