Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

The CTD3 installed on BSP2 was shutdown on 2016/09/24 at 00:30UTC until further notice to prevent interference with the DQ pressure sensor.

New ACO instruments were installed during the ACO-3 cruise on 2014/11/01. Click here for ACO-3 videos.

ALOHA Cabled Observatory
Hydrophone Experiment Module Engineering Data
Temperature
Temperature 1 :
Temperature 2 :
Temperature 3 :
Temperature 4 :
12.69929
12.883644
15.298796
8.681387
°C
°C
°C
°C
Date: April 29, 2017    21:15:30 UTC
Pressure, Current, Voltage
Pressure:
Center +48 V dc:
+48 V dc :
Ground Fault Offset:
Voltage Reference:
3.851534
24.048
48.168
-0.072
2.487
PSI
V
V
V
V
Date: April 29, 2017    21:15:30 UTC