Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

The CTD3 installed on BSP2 was shutdown on 2016/09/24 at 00:30UTC until further notice to prevent interference with the DQ pressure sensor.

New ACO instruments were installed during the ACO-3 cruise on 2014/11/01. Click here for ACO-3 videos.

ALOHA Cabled Observatory
Junction Box Engineering Data
JBox Engineering Data
Temperature Pressure 1 :
Temperature Pressure 2 :
Temperature :
Temperature Regenerator :
Pressure :
Voltage (12) :
Voltage (48) :
Voltage reference :
8.3
7.7
9.7
6.6
5.1
12
47.9
2.497
°C
°C
°C
°C
psi
V
V
V
Date: April 29, 2017    21:22:00 UTC