Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

Sensor maintenance during the ACO-8 cruise (5/28-6/2/2021): the BSP-5 with CTD4 and CAM2 with lights were installed.

ALOHA Cabled Observatory
Junction Box Engineering Data
JBox Engineering Data
Temperature Pressure 1 :
Temperature Pressure 2 :
Temperature :
Temperature Regenerator :
Pressure :
Voltage (12) :
Voltage (48) :
Voltage reference :
9
8.3
10.3
6.8
3.1
12
47.8
2.497
°C
°C
°C
°C
psi
V
V
V
Date: April 20, 2024    03:12:12 UTC