Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

New instruments were installed during the ACO-6 cruise on 6/20/2018 (hydrophone, secondary node). BSP1 and BSP2 disconnected from ACO until further notice. Data affected: CTD2, CTD3, Pressure and Fluorometer.

ALOHA Cabled Observatory
Junction Box Engineering Data
JBox Engineering Data
Temperature Pressure 1 :
Temperature Pressure 2 :
Temperature :
Temperature Regenerator :
Pressure :
Voltage (12) :
Voltage (48) :
Voltage reference :
8.8
8.1
10.3
6.8
4.4
12
47.8
2.497
°C
°C
°C
°C
psi
V
V
V
Date: September 22, 2018    09:22:00 UTC