Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

Sensor maintenance during the ACO-8 cruise (5/28-6/2/2021): the BSP-5 with CTD4 and CAM2 with lights were installed.

ALOHA Cabled Observatory
Power Supply Engineering Data
Voltage of the Stacks
Voltage (DC0) :
Voltage (DC1) :
Voltage (DC2) :
Voltage (DC3) :
Voltage (DC4) :
Voltage (DC5) :
Voltage (DC6) :
Voltage (DC7) :
0
100.3
0
101.8
0
102.6
0
102.1
V
V
V
V
V
V
V
V
Date: September 20, 2021    12:04:00 UTC
A, B bus Currents
Current A bus :
Current B bus :
Current A Regulator :
Current B Regulator :
Voltage Sensor :
Voltage Seawater return :
Line Current :
Voltage Reference :
0.938
5.95
2.538
3.15
0.21
-2.251
1.638
2.473
A
A
A
A
V
V
A
V
Date: September 20, 2021    12:04:00 UTC

 

A, B bus Voltages
Voltage A bus :
Voltage B bus :
Voltage Reference :
48.689
49.13
2.471
V
V
V
Date: September 20, 2021    12:04:00 UTC

 

ACDC Converter Temperatures
Temperature (DC0) :
Temperature (DC1) :
Temperature (DC2) :
Temperature (DC3) :
Temperature (DC4) :
Temperature (DC5) :
Temperature (DC6) :
Temperature (DC7) :
22.3
49.6
23.9
47.4
22.8
49.7
24.5
47
°C
°C
°C
°C
°C
°C
°C
°C
Date: September 20, 2021    12:04:00 UTC