Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

The CTD3 installed on BSP2 was shutdown on 2016/09/24 at 00:30UTC until further notice to prevent interference with the DQ pressure sensor.

New ACO instruments were installed during the ACO-3 cruise on 2014/11/01. Click here for ACO-3 videos.

ALOHA Cabled Observatory
Power Supply Engineering Data
Voltage of the Stacks
Voltage (DC0) :
Voltage (DC1) :
Voltage (DC2) :
Voltage (DC3) :
Voltage (DC4) :
Voltage (DC5) :
Voltage (DC6) :
Voltage (DC7) :
105.4
0
101.8
0
0
0
102.2
0
V
V
V
V
V
V
V
V
Date: April 29, 2017    21:22:48 UTC
A, B bus Currents
Current A bus :
Current B bus :
Current A Regulator :
Current B Regulator :
Voltage Sensor :
Voltage Seawater return :
Line Current :
Voltage Reference :
0.9
2.1
2.8
3.488
0.46
-2.259
1.64
2.473
A
A
A
A
V
V
A
V
Date: April 29, 2017    21:22:48 UTC

 

A, B bus Voltages
Voltage A bus :
Voltage B bus :
Voltage Reference :
48.769
49.169
2.471
V
V
V
Date: April 29, 2017    21:22:48 UTC

 

ACDC Converter Temperatures
Temperature (DC0) :
Temperature (DC1) :
Temperature (DC2) :
Temperature (DC3) :
Temperature (DC4) :
Temperature (DC5) :
Temperature (DC6) :
Temperature (DC7) :
49
24.5
50
22.7
20.2
23.4
48.5
21.7
°C
°C
°C
°C
°C
°C
°C
°C
Date: April 29, 2017    21:22:48 UTC