Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

Sensor maintenance during the ACO-8 cruise (5/28-6/2/2021): the BSP-5 with CTD4 and CAM2 with lights were installed.

Slide 1

Moving of the AMM

Slide 7

Connecting the Camera to the AMM

Slide 1

Inspecting the TAAM

Example Frame

<=Return to Deployment Cruise