Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

Sensor maintenance during the ACO-8 cruise (5/28-6/2/2021): the BSP-5 with CTD4 and CAM2 with lights were installed.

ACO Construction Videos

Slide 1

ALOHA Cabled Observatory-The Movie

Slide 2

JASON doing post-deployment clean-up.

Slide 6

Junction Box being prepared for deployment.

Slide 5

Free-fall deployment of the camera.

Example Frame