Please subscribe to the ACO-status mailing list for future ACO operational advisories and alerts.

Sensor maintenance during the ACO-8 cruise (5/28-6/2/2021): the BSP-5 with CTD4 and CAM2 with lights were installed.

ALOHA Cabled Observatory
Hydrophone Experiment Module Engineering Data
Temperature
Temperature 1 :
Temperature 2 :
Temperature 3 :
Temperature 4 :
12.771325
12.955479
15.44096
8.872079
°C
°C
°C
°C
Date: September 08, 2026    03:35:29 UTC
Pressure, Current, Voltage
Pressure:
Center +48 V dc:
+48 V dc :
Ground Fault Offset:
Voltage Reference:
1.717881
24.048
48.144
-0.048
2.4885
PSI
V
V
V
V
Date: September 08, 2026    03:35:29 UTC